About Accessibility

Accessibility

We want everyone who visits waytrk.io to be able to read it and use it. Here is how accessible the website is, how we check it and how to tell us about a problem.

What this covers

This statement covers the website at waytrk.io. The waytrk app at app.waytrk.io has its own statement, at waytrk.io/accessibility/app.

What you should be able to do

  • use every page and menu with a keyboard alone
  • zoom in without the page scrolling sideways on a phone-sized screen
  • read every page with your system's reduced-motion setting on, which stops the moving pictures
  • use the site with a screen reader: each picture of the product has a written description

How accessible the website is

The website partly meets the Web Content Accessibility Guidelines (WCAG) version 2.2 at level AA: the automated checks pass, but not every check has been done by hand yet. The list below says what is still to check.

What we have not checked by hand yet

  • Screen readers. We have not yet listened to the site with NVDA, JAWS or VoiceOver.
  • Zoom to 400% and enlarged text spacing on every page.
  • The interactive example plan, beyond the automated checks.

How we test

This is a self-assessment. We have not commissioned an independent audit.

Every change to the website is checked automatically before it goes live. Each page is opened in a browser, under the site's real security settings, and checked with axe-core against WCAG 2.2 A and AA, with the pictures in their finished state. Each page is also checked at desktop and phone widths for sideways scrolling, and the menus are opened with the keyboard.

Tell us about a problem

If something on the website is hard to use, or you need information in a different format, email [email protected]. Tell us the page and what went wrong. A person replies within 5 working days.

Keeping this up to date

We review this statement after major changes to the website and at least once a year.

Last reviewed 31 October 2026.

Something hard to use?

Write to [email protected] and a person replies by email.

Accessibility

What am I looking at?

Part of waytrk's website. waytrk shows whether the work your teams plan supports your strategy.