About Accessibility of the app

Accessibility of the app

We want as many people as possible to be able to use waytrk. Here is how accessible the app is, how we tested it and how to tell us about a problem.

What this covers

This statement covers the waytrk app at app.waytrk.io. The website at waytrk.io has its own statement, at waytrk.io/accessibility.

What you should be able to do

  • use every page with a keyboard alone
  • zoom to 400% without text spilling off the screen
  • use the app in a light or a dark appearance, and with your system's high-contrast and reduced-motion settings
  • use the app with a screen reader
  • see where you are on a page, because the focused item is always outlined

How accessible the app is

The app partly meets the Web Content Accessibility Guidelines (WCAG) version 2.2 at level AA, because of the issues and limits listed below.

What we know is not fully accessible

  • Timelines and maps at small widths. The Work timeline and the OKRs and KPIs maps keep their time scale on narrow screens and at high zoom, so they scroll sideways inside their own area. The OKRs page has a List view with the same Key Results as a table.
  • Small parts of the “Who depends on whom” bars. A coloured part too narrow to point at is not a link. Its row's name opens the same dependencies.
  • Text size without zoom. If you enlarge only the text in your browser settings, most text stays the same size. Use browser zoom instead, which enlarges everything.
  • Not yet checked by hand: invitation, two-step verification set-up and first sign-in; onboarding and registration.
  • Screen readers on Apple devices. We have tested with NVDA on Windows but not yet with VoiceOver on a Mac, iPhone or iPad. Our automated Safari checks cover the names, dialog titles, focus and status messages VoiceOver relies on, but not what it reads aloud.

How we tested

This is a self-assessment. We have not commissioned an independent audit.

We last tested on 30 October 2026 (Safari engine) and 28 October 2026 (everything else), on the sign-in page, Home, Work, OKRs, KPIs, recording a figure, Dependencies, Organisation, Insights and its CSV export, Help, User management, Billing, first-plan setup, importing Initiatives from a workbook, the meeting brief and the printable Year in review. We used:

  • automated checks with axe-core against WCAG 2.2 AA, in light and dark appearances and at 320 and 1280 pixels wide, run as part of our browser tests
  • manual keyboard-only checks, focus visibility, zoom to 200% and 400%, text spacing, and the names and roles each control gives assistive technology, in Chrome on Windows
  • automated checks in the Safari browser engine (WebKit), on a desktop window and an iPhone-sized screen (30 October 2026): on the sign-in page, Home, Work, OKRs and User management, every item reached by the keyboard shows a visible outline and none is hidden behind the top bar, the Help button or a sticky Save bar; the date field is outlined when focused; recording a figure opens a dialog named by its title, with focus on the first field, Escape closes it and returns focus to the Key Result, and saving shows the “Value recorded.” status message; the pages fit a window at the equivalent of 200% and 400% zoom without sideways scrolling, except inside the timelines; and every control has a name
  • the NVDA screen reader with Chrome on Windows, checking what is announced as you move through each page and its dialogs (28 October 2026)

We have not tested with VoiceOver on macOS or iOS. We fixed the problems we found before publishing this statement.

Tell us about a problem

If you have difficulty using waytrk, or you need information in a different format, email [email protected]. Tell us the page and what went wrong. A person replies within 5 working days.

Keeping this up to date

This statement was prepared on 31 October 2026. We review it after major changes to the app and at least once a year.

Last reviewed 31 October 2026.

Something hard to use?

Write to [email protected] and a person replies by email.

Accessibility of the app

What am I looking at?

Part of waytrk's website. waytrk shows whether the work your teams plan supports your strategy.

Words on this page

Key Result
A dated target that shows an Objective's progress.
OKR
Objectives and Key Results: an Objective with its Key Results.
KPI
A key performance indicator: a measure you track all the time.
Initiative
A piece of planned work.
Dependency
One piece of work needs another to finish first.