How do you assess a function's maturity without a consultant?

Can a team rate its own maturity honestly enough to plan from, and what does a good self-assessment look like?

Have the people who run the function rate it themselves, on a few areas and a fixed scale, in two columns: where it is now and where the strategy needs it to be. Ask a leader who knows the function to read the result and say whether they recognise it. Keep every assessment as a dated revision. That is enough to plan from, and it can be done in an hour. A consultant's assessment is more polished, but it belongs to the consultant; a self-assessment belongs to the people who have to close the gaps.

Figure 1. One function's self-assessment, now and target Illustrative example, not data
  • Now
  • Where the strategy needs it

Processes Now 4, Where the strategy needs it 7

People and skills Now 5, Where the strategy needs it 7

Information Now 3, Where the strategy needs it 8

Tools Now and Where the strategy needs it both 6

A 0 to 10 scale. The areas and ratings are invented to show the form.

It has been done before

The idea that alignment and maturity can be assessed and then improved on purpose has a long history in IT. Jerry Luftman argued in 2000 that business and IT alignment can be assessed as a maturity level across six areas and improved deliberately [1]. Capability-based planning, as the TOGAF guidance sets it out, plans change against the capabilities that have gaps [2]. A self-assessment of each function is the practical bridge between the two: it shows where the gaps are, in terms the function's own people accept.

Five rules that keep it honest

Few areas, the same for every function. Four to eight areas is plenty. Using the same ones everywhere means results can be compared and added up.

Two columns, not one. A rating on its own says nothing. The gap between now and target is what the plan works on.

The people who do the work rate it. They know where the problems are. A leader then reads it and challenges anything they would not recognise.

Unrated is not zero. If nobody can rate an area, leave it blank and say so. A zero looks like a finding; a blank is honest.

Keep every revision, dated. A rating is a judgement, not a measurement, and judgements change. The history is the evidence that the plan is working: this function said 3 last spring and 5 now, and here is what was done in between.

What to do with the result

Every gap should have work aimed at it or a decision not to close it yet. A gap with nothing against it is the same finding as an aim with no work, one level down. Why this matters more than the project list is in why organisational capabilities matter more than project lists, and the method in plain words is in what is capability-based planning.

In waytrk, each Function assessment is a dated revision on a 0 to 10 scale, and an area nobody has rated shows as not rated.

References

Every figure above points at an entry in the evidence base, which records the source, its method, its grade and its limits.

  1. Luftman, J. (2000) Assessing business-IT alignment maturity. Communications of the Association for Information Systems, 4(14). Original source (opens in a new tab)

    Grade AGrade AThe strongest evidence: a meta-analysis, a systematic review, a peer-reviewed empirical study, or an official body's own measurement. Register entry 18

  2. The Open Group, TOGAF Series Guide, Business Capability Planning (TOGAF Standard, 10th Edition); free registration required to read it. Original source (opens in a new tab)

    Grade CGrade CAn argued source, such as a book or a method, rather than a measurement. Register entry 19

Capability maturity assessment without consultants

What am I looking at?

An article from our knowledge centre on turning strategy into delivery. Every figure is traced to its source, with its limits.

Words on this page

Initiative
A piece of planned work.
Function
A team, department or service, with its own plan.