There are two ways, and they answer different questions. The first measures value: how much of what the strategy promised actually arrived. That is how researchers have measured the gap, and the answer is partial delivery rather than failure. The second measures line of sight: how many of the organisation's aims have work against them, and how much of its work is aimed at something. The first tells you the size of the gap after the event. The second tells you where it is opening while there is still time to act.
Value delivered
The share of the promised value that arrived. Taken after the event, and hard to do well inside one organisation.
Line of sight
Aims with nothing aimed at them, work with no aim, and links nobody can explain. Taken now, and again each quarter.
Measuring by value
Mankins and Steele's 2005 survey of senior executives at large companies found that, on average, companies delivered 63% of the financial value their strategies promised [1]. McKinsey's 2021 survey of people who had been through a transformation found that fewer than a third succeeded in improving performance and sustaining it, and that, of the value their transformations lost, about 35% was lost during implementation and another 20% after it [2].
Both are surveys of people's own estimates, and the 2005 figure is old. But they agree on the shape of the problem: the gap is partial delivery, and most of it opens during implementation.
Inside a single organisation, measuring by value is hard. It needs a credible estimate of what was promised, a credible measure of what arrived, and enough time for the difference to show. By the time you have all three, the strategy has usually moved on.
Measuring by line of sight
The faster measure counts connections rather than value. Take two lists, the aims the organisation has agreed and the work it is paying for, and link them in the owners' words. Then count three things:
- aims with nothing aimed at them;
- work that serves no aim;
- links an owner cannot explain.
Those three numbers are a measure of the gap you can take this month. They do not say how much value is at stake, but they say where it will be lost, and taken again next quarter they show whether the gap is closing. That is a method, not a research finding. I think it is the most useful proxy available, because the research places the loss in implementation, which is where the connection between aims and work is weakest.
Which to use
Both, for different purposes. The value measure belongs in an annual look back at what the strategy achieved. The line-of-sight measure belongs in every quarterly review, because it is the one you can act on. For why the loss happens where it does, see strategies don't fail, they half-work. For the practical version of the count, see how to find projects that don't support the strategy.
waytrk takes the second measure all the time: an Objective with no Initiative against it, or an Initiative with no strategic link, is shown as a finding rather than hidden in a status colour.