Do 70% of change programmes really fail?

Where does the 70% failure figure come from, and is there any evidence behind it?

No, or at least nobody has shown that they do. In 2011 Mark Hughes traced the published sources of the claim that 70% of organisational change initiatives fail, for the Journal of Change Management, and found no valid, reliable evidence to support it [1]. The number has been repeated so often that it feels measured. It was not.

Figure 1. How the 70% figure travelled
  1. 1995, Kotter

    Eight errors drawn from watching more than 100 companies. No failure percentage.

  2. 2000, Beer and Nohria

    "About 70% of all change initiatives fail", stated with no study or source.

  3. 2011, Hughes

    Traces the published sources and finds no valid, reliable evidence for the figure.

Kotter [2]; Beer and Nohria [3]; Hughes [1]

Where it came from

The most quoted version is Beer and Nohria's 2000 Harvard Business Review article, which states that "the brutal fact is that about 70% of all change initiatives fail" and gives no source for it [3]. Their explanation of why change fails rests on their experience; the number itself is asserted, not measured.

It is also often credited to John Kotter. His 1995 article, Leading Change, describes eight errors he saw while watching more than 100 companies try to transform themselves. It contains no failure percentage. Kotter describes most efforts as falling "somewhere in between" success and failure [2], which is a more useful description than any single number.

Why it matters

A wrong number misleads in a particular direction. A 70% failure rate makes change sound like a gamble you usually lose, which encourages two bad responses: fatalism ("most of these fail anyway") and theatre ("we need a bold programme to beat the odds"). Neither helps anyone deliver.

The measured figures, where they exist, point somewhere more useful. They describe strategies and transformations that partly deliver, with a predictable share of the value lost during implementation. That is a problem you can look for and manage, rather than odds you can only hope to beat. I set out those measurements in strategies don't fail, they half-work, and how to take your own in how to measure the gap between strategy and execution.

What to say instead

If you need a sentence for a business case or a board paper, drop the 70%. Say that the evidence shows partial delivery is common, that most of the loss happens during implementation, and that you will measure your own progress rather than borrow someone else's statistic. If anyone has a primary source for the 70% figure, I would like to read it.

waytrk's knowledge centre keeps an evidence register for exactly this reason: every figure on these pages links to its source, its grade and its limits.

References

Every figure above points at an entry in the evidence base, which records the source, its method, its grade and its limits.

  1. Hughes, M. (2011) Do 70 per cent of all organizational change initiatives really fail? Journal of Change Management, 11(4), 451–464. Original source (opens in a new tab)

    Grade AGrade AThe strongest evidence: a meta-analysis, a systematic review, a peer-reviewed empirical study, or an official body's own measurement. Register entry 6

  2. Kotter, J. P. (1995) Leading change, why transformation efforts fail. Harvard Business Review, March–April 1995. Original source (opens in a new tab)

    Grade CGrade CAn argued source, such as a book or a method, rather than a measurement. Register entry 8

  3. Beer, M. and Nohria, N. (2000) Cracking the code of change. Harvard Business Review, May–June 2000. Original source (opens in a new tab)

    ContestedContestedWidely repeated, but the trail leads to no evidence, or to weaker evidence than the claim implies. Cited only to correct it. Register entry 7

Do 70 percent of change initiatives fail?

What am I looking at?

An article from our knowledge centre on turning strategy into delivery. Every figure is traced to its source, with its limits.

Words on this page

Initiative
A piece of planned work.
Function
A team, department or service, with its own plan.
Plan alternative
A copy of a plan with different dates or costs, to compare before choosing.
Owner
Keeps a Function's plan current and decides on suggested changes.