On the evidence, yes. Formal strategic planning is associated with better organisational performance: the effect is positive, moderate and statistically significant, and it holds across public and private organisations and between US and non-US studies. That is the finding of the most recent meta-analysis of the question, which pooled 87 results from 31 studies [1]. It is not a large effect, the studies behind it are mostly correlational, and the number tells you nothing about how to plan. But it is a measured answer, and the rest of this article is about what it does and does not support.
Single studies: from slightly negative (−0.31) to strong (0.75) −0.31 to 0.75
All studies pooled: 0.23 0.229
0 means planning made no difference
George, Walker and Monster's meta-analysis of 87 correlations from 31 studies [1]; Miller and Cardinal's synthesis of 26 studies [2]
I wrote this because I kept meeting two confident positions, one that planning is obviously essential and one that it is a corporate ritual that produces binders, and neither side could point me at a study. Here is what the studies say.
What the meta-analyses found
The question has been researched since the 1970s, mostly by correlating some measure of how formally an organisation plans with some measure of how it performs. Three syntheses stand out because they pool or review that work rather than adding one more study to it.
- 26 studiesMiller and Cardinal's synthesis, 1994
- 87 correlationsfrom 31 studies, George, Walker and Monster's meta-analysis, 2019
- 117 articlespublished from 1980 to 2011, Wolf and Floyd's review, 2017
Miller and Cardinal [2]; George, Walker and Monster [1]; Wolf and Floyd [3]
The first is Miller and Cardinal's 1994 synthesis of 26 studies, published in the Academy of Management Journal. They found that strategic planning was positively related to firm performance, and that the contradictory results of the preceding two decades were explained mostly by differences in research method, not by anything about planning itself; across the studies they pooled, correlations with growth ran from −0.31 to 0.75 [2]. That second finding matters as much as the first: when study after study disagreed, the disagreement was in the measuring, not in the thing being measured.
The second is George, Walker and Monster's 2019 meta-analysis in Public Administration Review. Across 87 correlations from 31 studies, the mean effect of strategic planning on organisational performance was .229, which the authors describe as positive, moderate and significant. The effect was strongest where performance was measured as effectiveness, whether the organisation achieved what it set out to achieve, and weakest where it was measured as efficiency. It did not differ significantly between public and private organisations, or between studies from the United States and elsewhere [1].
Two things in that study deserve to be printed as prominently as the headline. The authors tested for publication bias and could not rule it out, which means the true effect may be smaller than .229. And studies that drew planning and performance data from a single source reported larger effects than those that used more than one, which is the usual sign that some of the correlation comes from the same person rating both. The register entry for this claim records both limits, and I would rather you read them than the number.
Why the field looked contradictory for so long
If you read individual studies instead of the syntheses, the picture is messier. Wolf and Floyd's 2017 review in the Journal of Management covered 117 strategic planning articles published between 1980 and 2011. They found the evidence for a positive planning–performance link still inconclusive, particularly on the role of environmental and organisational contingencies, and treated methodological differences as one important source of the inconsistency [3].
That is the honest state of the research. Planning helps on average. The average hides a wide range. The range is mostly about how the studies were done, and partly about conditions that the studies have not pinned down: what kind of organisation, what kind of environment, what kind of planning. Anyone who tells you planning is proven, or proven useless, is reading one end of the distribution.
The case against, and what it gets right
The best-known critique is Henry Mintzberg's, in his 1994 book and the Harvard Business Review article that went with it. His argument was that formal planning crowds out strategic thinking: it mistakes analysis for strategy, and it is good at programming a strategy that already exists and bad at creating one [4]. He was describing the planning departments of the 1970s and 1980s, and much of what he described is still recognisable: the annual cycle, the templates, the document that is finished and then filed.
The meta-analyses do not refute Mintzberg, because they are not measuring the same thing. They measure whether organisations that plan formally perform better than those that do not. He was arguing about what planning should be for. Both can be right, and I think both are. Planning that produces decisions, commitments and a shared picture of what the organisation is trying to do seems to help. Planning that produces a document does not, and the research on formality has not yet separated the two.
The 2019 meta-analysis gives one clue. Its authors note a smaller effect where studies measured participation in planning rather than its formality. I would not build much on that single coefficient, but it sits awkwardly with the belief that the more people you involve, the better the plan works. Involvement may be necessary for a plan to be understood. It is not the same as a plan being right.
Small organisations
Most of this research is about large firms and public bodies. For small and new organisations the question has its own literature. Brinckmann, Grichnik and Kapsa's 2010 meta-analysis in the Journal of Business Venturing found that in small firms, business planning is positively associated with performance, with the strength of the relationship depending on context, notably how new the firm is and the cultural environment it operates in [5]. The same shape again: a positive average, and conditions that matter.
What I take from this
Three things, and I will keep them apart because they are three different kinds of statement.
What the research shows
Formal planning is associated with moderately better performance, most clearly when performance means achieving what was intended.
What I conclude
The useful question is what planning produces. The evidence rewards decisions kept connected to the work, not the document.
What waytrk recommends
A method, not a finding. Keep the aims and the work in one place, and look first at aims with no work and work with no aim.
What the research shows is that formal planning is associated with moderately better performance, most clearly when performance means effectiveness, and that the variation between studies comes mostly from method and from conditions the field has not resolved.
What I conclude from it is that the useful question is not whether to plan but what the planning has to produce. The evidence rewards organisations that decide what they are trying to achieve and keep that decision connected to what they do. It gives no credit for the document. Mintzberg's warning and the meta-analyses point the same way once you read them together: the plan is the set of commitments, not the file.
What waytrk recommends as a method follows from that, and it is a method, not a finding. Keep the aims and the work in one place where both can be seen; make every piece of work say which aim it serves; and treat an aim with no work against it, or work with no aim, as the first thing to look at. The straight line from a strategy to the things people are doing on Monday is where the research says the value is, and it is where most organisations have no line of sight. I wrote about that gap, and how large it has been measured to be, in Strategies don't fail. They half-work, and nobody can see where.
One line on waytrk: it shows whether every aim has work against it and every piece of work has an aim, which is the connection this evidence says matters.