ADKAR is Jeff Hiatt's model, published by Prosci, of the sequence an individual goes through in change: awareness, desire, knowledge, ability and reinforcement [1]. Each element builds on the one before, so the first low score tells you where to start helping. To use it across a portfolio, rate it for each group of people a change affects, not for each project, and read the ratings for one group across all the changes landing on it. A group that is low on desire for three changes at once has a different problem from one that is low on knowledge for one.
| Element | Advisers | Leaders | Field staff |
|---|---|---|---|
| Awareness | 4 | 5 | 2 |
| Desire | 4 | 2 | 2 |
| Knowledge | 2 | 3 | 1 |
| Ability | 2 | 3 | 1 |
| Reinforcement | 1 | 2 | 1 |
ADKAR's five elements [1], rated 1 (not established) to 5 (consistently shown). Help starts at the first low score, so with knowledge for advisers, desire for team leaders and awareness for field staff. The groups and ratings are invented to show the form.
What each element asks
Awareness: do people understand why the change is happening? Desire: are they willing to take part? Knowledge: do they know what to do differently? Ability: can they actually do it? Reinforcement: is support in place to keep it working? The value of the model is that each low score points to a different kind of help. Low knowledge needs guidance and training. Low desire needs a conversation with a manager about what worries people, not another all-staff email. It is a model rather than a measurement, so use it to decide what to do, not to prove anything.
Using it across many changes
Used one project at a time, ADKAR misses the point that people experience changes all at once. Three adjustments make it work across a portfolio.
Rate groups, not projects. The contact centre's readiness for a new system says more than the project's average readiness across everyone it touches.
Read across the changes. Put each group's ratings for every change landing on it side by side. Persistently low desire across several changes can be a sign of saturation rather than of a badly run project.
Keep it optional. A missing readiness rating should never stop anyone recording the impact. Impact first, readiness where you can.
Is it worth the effort?
Prosci reports that, among more than 2,600 change practitioners rating their own projects, those with excellent change management met or exceeded their objectives 88% of the time, against 13% with poor change management [2]. Those are self-reported figures from the firm that publishes ADKAR, so weigh them accordingly. How readiness fits with impact is in change impact: the people cost nobody adds up, and how to spot overload is in what change saturation is and how to measure it.
waytrk lets each change assessment carry ADKAR ratings from 1 to 5 for the affected group, and shows where support needs to start on its readiness view.